A Gantt chart is a schedule drawn as bars: tasks go down the left, dates go across the top, and each bar runs from a task’s start date to its end date. Excel has no built-in “Gantt” chart type, so you either bend a bar chart or color cells. This guide shows both, step by step.

1. Two ways to make a Gantt chart in Excel
| Method | How it works | When dates change |
|---|---|---|
| Stacked bar chart | Microsoft’s method: a stacked bar chart with the first series hidden (Microsoft Support) | You may need to fix the axis again |
| Conditional formatting | Each cell in a week column turns colored if it falls between start and end | Bars move by themselves |
2. Step by step: the conditional formatting method

- List tasks: column A = task, B = start date, C = end date.
- Duration: in D2 type
=C2-B2+1and fill down. - Week headers: put the project start date in E1. In F1 type
=E1+7and fill right for 12 columns. - Draw the bars: select E2 to the bottom-right of your grid → Home › Conditional Formatting › New Rule › Use a formula →
=AND(E$1+6>=$B2, E$1<=$C2)→ pick a fill color. - Status colors: add a status column with Data › Data Validation › List (Not started, In progress, Done, Late) and one more rule per status color.
- This week marker (optional): a rule with
=AND(E$1<=TODAY(), TODAY()<E$1+7)and a bold border.
The same formulas work in Google Sheets (Format › Conditional formatting › Custom formula).
3. The bar chart method in short
Microsoft’s guide: select task, start date and duration → insert a stacked bar chart → set the first series to “No fill” → reverse the task order and set the axis minimum to your start date (Microsoft Support). It looks nice, but the axis is a fixed number, so moving the project start means editing it again.
4. Common mistakes
- End date before start date: no bar appears. Check that duration is 1 or more.
- Day-long tasks in a weekly grid: the whole week gets colored. Use day columns for short tasks.
- Too many colors: 4–5 status colors are enough.
- Mixed-up references: keep the
$signs exactly as above (E$1,$B2).
5. Free templates vs a ready file
Free templates are popular: Vertex42 says its Excel Gantt template has “over 3 million downloads” (Vertex42). If you’d rather not build rules yourself, compare options in our free vs paid Gantt template guide, or sketch a chart first with the free online Gantt tool (screen in Korean, no sign-up).
6. FAQ
Does Excel have a Gantt chart template? There is no Gantt chart type; Microsoft shows a stacked bar method instead.
How do I make the bars update automatically? Use the conditional formatting rule in step 4. Change a date and the color moves.
Does it work in Google Sheets? Yes, with Custom formula in conditional formatting.
How many tasks can I track? As many rows as you like; for readability, many people keep one screen of tasks per sheet.
Sources
- Microsoft Support – Gantt chart in Excel: https://support.microsoft.com/en-us/office/present-your-data-in-a-gantt-chart-in-excel-f8910ab4-ceda-4521-8207-f0fb34d9e2b6
- Vertex42 Excel Gantt template: https://www.vertex42.com/ExcelTemplates/excel-gantt-chart.html
🎁 Free: 7-day starter checklist for earning extra income
Leave your email and get the free checklist now. No spam, unsubscribe anytime.
Popular guides
- Top 10 Ways to Make Money Starting This Week (Free Checklist)
- Passive Income Ideas: Realistic Options for 2026
- Make Money Online Without Investment: 20 Free Ways
- How to Make Money with AI: 50 Practical Ways (2026)
- How to Make Money From Home: 20 Legit Ways
- Make Money Online for Beginners: 15 Easy Ways to Start
- 16 Legit Ways to Make Money Fast (This Week)
- How to Make Money as a Teenager: 16 Safe Ideas
- 14 Remote Jobs With No Experience Needed
Next method: Large Print Puzzles for Seniors: Sudoku and Word Search That Are Easy on the Eyes →