Gantt Chart Template in Excel: Build One Step by Step (Bars That Move Themselves)

Skip the setup: a 12-week Excel / Google Sheets file where bars color themselves when you type dates.

$4.49 USD

Get the Gantt Excel Template →
Instant download after payment · Free Gantt chart maker
Gantt Chart Template in Excel: Build One Step by Step (Bars That Move Themselves)

Written by

in

XFacebook
Gantt Chart Template in Excel: Build One Step by Step (Bars That Move Themselves)
Path

At a glance

Step-by-step plan6 steps (free, below)
Contents

A Gantt chart is a schedule drawn as bars: tasks go down the left, dates go across the top, and each bar runs from a task’s start date to its end date. Excel has no built-in “Gantt” chart type, so you either bend a bar chart or color cells. This guide shows both, step by step.

Example Gantt chart

1. Two ways to make a Gantt chart in Excel

Method How it works When dates change
Stacked bar chart Microsoft’s method: a stacked bar chart with the first series hidden (Microsoft Support) You may need to fix the axis again
Conditional formatting Each cell in a week column turns colored if it falls between start and end Bars move by themselves

2. Step by step: the conditional formatting method

Five steps

  1. List tasks: column A = task, B = start date, C = end date.
  2. Duration: in D2 type =C2-B2+1 and fill down.
  3. Week headers: put the project start date in E1. In F1 type =E1+7 and fill right for 12 columns.
  4. Draw the bars: select E2 to the bottom-right of your grid → Home › Conditional Formatting › New Rule › Use a formula → =AND(E$1+6>=$B2, E$1<=$C2) → pick a fill color.
  5. Status colors: add a status column with Data › Data Validation › List (Not started, In progress, Done, Late) and one more rule per status color.
  6. This week marker (optional): a rule with =AND(E$1<=TODAY(), TODAY()<E$1+7) and a bold border.

The same formulas work in Google Sheets (Format › Conditional formatting › Custom formula).

3. The bar chart method in short

Microsoft’s guide: select task, start date and duration → insert a stacked bar chart → set the first series to “No fill” → reverse the task order and set the axis minimum to your start date (Microsoft Support). It looks nice, but the axis is a fixed number, so moving the project start means editing it again.

4. Common mistakes

  • End date before start date: no bar appears. Check that duration is 1 or more.
  • Day-long tasks in a weekly grid: the whole week gets colored. Use day columns for short tasks.
  • Too many colors: 4–5 status colors are enough.
  • Mixed-up references: keep the $ signs exactly as above (E$1, $B2).

5. Free templates vs a ready file

Free templates are popular: Vertex42 says its Excel Gantt template has “over 3 million downloads” (Vertex42). If you’d rather not build rules yourself, compare options in our free vs paid Gantt template guide, or sketch a chart first with the free online Gantt tool (screen in Korean, no sign-up).

6. FAQ

Does Excel have a Gantt chart template? There is no Gantt chart type; Microsoft shows a stacked bar method instead.

How do I make the bars update automatically? Use the conditional formatting rule in step 4. Change a date and the color moves.

Does it work in Google Sheets? Yes, with Custom formula in conditional formatting.

How many tasks can I track? As many rows as you like; for readability, many people keep one screen of tasks per sheet.

Sources

  • Microsoft Support – Gantt chart in Excel: https://support.microsoft.com/en-us/office/present-your-data-in-a-gantt-chart-in-excel-f8910ab4-ceda-4521-8207-f0fb34d9e2b6
  • Vertex42 Excel Gantt template: https://www.vertex42.com/ExcelTemplates/excel-gantt-chart.html
XFacebook

🎁 Free: 7-day starter checklist for earning extra income

Leave your email and get the free checklist now. No spam, unsubscribe anytime.

Popular guides

Next method: Large Print Puzzles for Seniors: Sudoku and Word Search That Are Easy on the Eyes →

How to Make Money
Add to Home Screen